: 4 x QSFP-DD 400GE and 32 x QSFP28/QSFP+ (100/40GE) ports.
: Connect to the Console or Management ports for initial configuration. The unit also includes a USB port and an SD slot for storage. Software Boot and Initial Commissioning 7250 IXR-X1
Wear an ESD grounding strap when handling the chassis. nokia 7250 ixr x1 installation guide
Open your terminal emulator program (configured to ).
Insert the dual AC PSUs into the rear bays until they latch completely. : 4 x QSFP-DD 400GE and 32 x QSFP28/QSFP+ (100/40GE) ports
Insert rack screws (and cage nuts if using a square-hole rack) through the bracket holes into the rack posts. Tighten the screws securely to prevent sagging. 4. Grounding the Router
: Maintain a continuous ambient operating temperature between 0°C and 40°C (32°F to 104°F). Software Boot and Initial Commissioning 7250 IXR-X1 Wear
Scrape away any paint or oxidation around the grounding pad area.
Note: SFP/SFP+/QSFP optical transceivers and console cables are typically ordered and shipped separately. 3. Mounting the Router in a Rack
At the console login prompt:
Secure the brackets using the flat-head screws provided in the mounting kit. Tighten to a torque specification of roughly 10 in-lbs (1.1 N-m).